Biotech pellet boiler maintenance

Biotech PZ 65RI/PZ100RL 99.9 kW pellet boiler troubleshooting. The boiler hadn’t been operating for about 3 months.
System pressure
System pressure

Read more...

Woodpecker Cosyman boiler maintenance

Keighley
BD20 5AN

Description of work:

Cosyman boiler fire tube
Fire tube needs to be replaced

Read more...

Woodpecker self cleaning pellet boiler maintenance

Huby
LS17 0BW

Description of work:

Fire tube
Fire tube

Read more...

Fairbourne

GWYNEDD
LL38 2LX


Solar thermal system installation for existing hot water cylinder with MCS certificate for RHI payment.

Read more...

Goldsborough

The objective of project was to uprade Atmos gasifier woodboiler and solar thermal system to RHI eligible. We also solved the problems we dicovered.


Read more...
Skip to toolbar